Skip to content
Akros Mimarlık
TR

Trade fair

Automechanika Istanbul 2027 stand builder

General view of the Waspo stand at the fair 2024 in Istanbul: a 60 sqm maxima system build.

A company bringing wheels, batteries, brake pads or workshop equipment to Automechanika Istanbul gets one thing from us: a stand drawn to its own plot, surfaces produced in our workshop in Beylikdüzü, a build at Tüyap by our own crew and dismantling on the closing evening. Our workshop sits close to Tüyap, so going back and forth to the hall during build week is daily routine rather than a logistics exercise.

What we do for you at Automechanika Istanbul

We start with a three-dimensional concept for your floor area. After your approval we prepare the technical file and send it to the hall management at Tüyap Fair and Congress Center ourselves. Walls, showcases, the product hanging system and a lockable back room are produced in the workshop and go through a trial assembly before they travel. Graphics and print are ours; you send the logo and product images and nothing else.

Automotive parts are heavy and often oily. The wall that carries wheels or exhaust systems is reinforced from behind; batteries and compressors go on floor plinths. If you want to run workshop equipment live we put the power line into the plan from day one and file the power request with the hall. Meeting space matters at this fair: distributor conversations should not happen in the aisle, so a table and, where the area allows, a closed meeting corner go into the plan.

Stands we have built at this fair

In 2024 we built the 60 square metre maxima stand for Waspo at Tüyap. A maxima stand of that size usually goes up in the hall in one to three days. Our other work for the sector is on the automotive page. If you are also going to the main fair in Frankfurt, the Automechanika Frankfurt page explains freight and the on-site support from our Aachen office.

Which stand type

  • Maxima system: 12–200 square metres, built in 1–3 days; our first suggestion for stands built around a product wall.
  • Custom timber build: 20–500 square metres, built in 2–5 days; when the brand needs its own form and uninterrupted surfaces.
  • Island and corner stands: on plots with two or more open sides the product wall is turned towards the aisle.

Timeline

The fair runs 24–27 March 2027. A comfortable programme starts on 27 January 2027 with the brief, the three-dimensional concept and the budget; design approval and technical file on 10 February, workshop production and print files on 24 February, trial assembly and lighting test in the workshop on 17 March. Build in the hall during fair week, a joint walk-through on 23 March, dismantling on the evening of 27 March. If you come later we first tell you what still fits, then run an accelerated programme. Put the fair name, your floor area and the number of open sides into the quote form; we reply within 48 hours and the first concept is free.

Automechanika Istanbul 2027: 24–27 March 2027, Tüyap Fair and Congress Center, Istanbul. 23 weeks to go. Official fair site

Preparation timeline

  1. 27 January 20278 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 10 February 20276 weeks before

    Design approval, technical file submitted to the organiser

  3. 24 February 20274 weeks before

    Production in the workshop; graphics and print files

  4. 17 March 20271 weeks before

    Trial assembly in the workshop, dispatch, ATA Carnet for abroad

  5. 24 March 2027Fair week

    Hall build, handover the day before opening, dismantling at close

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 1

All projects

Frequently asked

When and where is Automechanika Istanbul 2027?
Automechanika Istanbul 2027 takes place 24–27 March 2027 at Tüyap Fair and Congress Center (Istanbul). Dates come from the organiser’s official site; this page is updated if they change.
When should a stand for Automechanika Istanbul 2027 be ordered?
Starting by 27 January 2027 for a custom timber stand, or around 24 February 2027 for a maxima system stand, gives a comfortable schedule. For later starts we first tell you what can still be done.
Have you built at Automechanika Istanbul before?
Yes; 1 of our stands are listed on this page. Each project states the year, floor area and stand type; we know the hall rules and build hours from that work.
What should we send for a quote?
The fair name and dates (filled in from this page), your floor area and number of open sides, plus a floor plan and reference images if you have them. The first concept and a written budget frame arrive within a few working days; the concept is free of charge.
Can you hang heavy parts such as wheels and exhaust systems on the wall?
Yes. The hanging wall is reinforced from behind and the part weight goes into the first step of the design. When you ask for a quote, tell us the heaviest product you will show and how many of them; we draw the wall for that load.
How do stand height and hall rules work at Tüyap?
Height, suspended loads and the treatment of walls facing a neighbouring stand all need approval from the hall management. We prepare the technical file and run the correspondence; you only see the outcome.
Can we get power and compressed air for equipment running live?
We show the power need on the plan and open the request with the hall ourselves. If you need compressed air we have to know early; where the compressor sits on the stand is decided by its noise.
How long does the build take and who does it?
One to three days for a maxima system, two to five for a custom timber build, all by our own crew. Because the stand has already been assembled and taken apart once in the workshop, there are no surprises in the hall. We dismantle on the closing evening as well.

Let us build your stand at Automechanika Istanbul 2027

The link opens a quote form with the fair name and dates filled in; add your floor area and stand type and send it.

Request a quote

Other trade fairs