
EvafoneTechnology
Evafone 2026 Istanbul exhibition stand
12 m²2026IstanbulPetzoo Eurasia
Location
Bursa is one of the fair cities closest to our workshop: the stand leaves Beylikdüzü in the morning and the build starts in the hall the same day. That proximity makes two things easier. A part that turns out to be missing during the build comes from the workshop the next day, and for jobs that arrive shortly before a fair the accelerated programme genuinely works. We work with automotive suppliers, textile and machinery companies; we design, produce, build and dismantle the stand.
The fair name, dates, floor area and number of open sides come in; within 48 hours we send the first concept as a three-dimensional visual. After approval we submit the technical file to the organiser, produce in the workshop and assemble the stand once with a lighting test before it ships. Graphics and print, the electrical and lighting plan are ours. The hall's height limit and build hours come with the organiser's file, and we follow that file.
For automotive suppliers the 60 square metre maxima stand we built for Waspo at Automechanika Istanbul 2024 is a direct reference, and on the textile side the 72 square metre timber stand for Karadağ İplik at Iplik Istanbul 2025. Both are on the projects page; the industry pages are automotive, textile and machinery and industry. Companies from Bursa exhibiting in Istanbul will find our Tüyap and CNR Expo work on the Istanbul page.
Exhibitors from outside Turkey get the same service in Bursa: one contract, one contact in English, our crew in the hall for the build and the dismantling.
A comfortable programme starts 8 weeks before the fair: design approval at 6 weeks, workshop production and print files at 4 weeks, trial assembly and shipping at 1 week. Because the road to Bursa is short, the freight allowance in the schedule is small, and for a maxima stand we can take on late jobs on an accelerated programme. Your products travel on the same truck as the stand; the details are on the exhibition logistics page. The handover walk is the day before opening and the dismantling at the close is ours.
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly and lighting test in the workshop, dispatch
Hall build, handover the day before opening, dismantling at close
Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.
We produce all of the types below for Bursa fairs in our workshop in Beylikdüzü, Istanbul and build them with our own crew; the size range and build time come from our recorded projects.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

EvafoneTechnology
12 m²2026IstanbulPetzoo Eurasia

Er BakırMining
54 m²2025AtlantaInterwire

Yeniler EtiketPackaging
100 m²2025IstanbulEurasia Packaging Istanbul
Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.
Request a quote