Skip to content
Akros Mimarlık
TR

Industry

Textile trade fair stands

The textile fair stand we built for Karadağ İplik: illuminated logo on a timber-clad brand wall, a display wall of yarn cones, glass showcases and a meeting table.

A textile buyer picks up the fabric, holds it to the light and checks the colour against the card. We build the stand for that moment: lighting chosen to the colour temperature your cards were made under, a rack wall that carries the weight of the rolls, a full-height drop to show the drape, and a closed meeting room so the collection is not on view to the whole aisle. A textile stand is a sample room rather than a shop window, and that is how we draw it.

What we do for you at textile fairs

We draw the stand, produce it in our own workshop in Beylikdüzü, build it in the hall with our own crew and dismantle it when the fair closes. The hanging rails, roll racks and sample tables are made in the workshop, so there is somewhere to hang every piece the moment your fabric reaches the hall. Graphics, print and the technical file for the hall management are ours. For fairs abroad we run the stand freight, the ATA Carnet and customs; your collection travels on its own export papers.

Light takes most of our time on a fabric stand. The same cloth drifts yellow under warm light and blue under cool light, and a buyer holding a colour card sees it at once. We ask which light your cards were prepared under and choose the fittings to match. Roll weight is the second question: upholstery rolls are heavy, so the rack and the rail are reinforced for them. Full-height hanging for curtains, a floor and a mirror for mannequins: all on the plan from the start.

Which textile fairs we work at

Most textile fairs we build for are in Istanbul; the Tüyap and CNR Expo halls are described on our Istanbul page. On the yarn side, Iplik Istanbul Yarn Fair runs on 17–19 March 2027 and yarn producers have their own yarn page here. For textile and technical textile fairs in Germany, our Aachen office gives local support, with freight and customs handled by us.

Which stand type for a textile stand

  • Custom timber build: 20–500 square metres, built in 2–5 days. Uninterrupted surfaces, recessed roll shelving and a closed meeting room from a single hand.
  • Maxima system: 12–200 square metres, built in 1–3 days. The rack wall is fixed to the aluminium grid; our choice when the calendar is tight.
  • Country pavilion: 100–2000 square metres, built in 4–10 days. Several companies under one roof in a national participation.

How we work

Fair name, dates, floor area and number of open sides; within 48 hours you get a free first concept in three dimensions and a written budget in three options, scope itemised. Start 8 weeks before the fair: design approval and technical file at 6 weeks, workshop production at 4, trial assembly and lighting test at 1. Bring a fabric sample to the lighting test; that is where the colour is checked. The quote form is here.

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

How do you make sure the fabric colour matches the card on the stand?
We ask for the colour temperature your cards were prepared under and select the fittings to it. At the trial assembly in our workshop we hang your fabric sample and check the light together, so there is no surprise in the hall.
Can you hang heavy fabric rolls?
Yes. Put the weight of the upholstery and curtain rolls in the brief and the rack wall and shelving are reinforced accordingly. Full-height drops use the stand height up to the hall’s limit.
We do not want everyone to see the collection. Can you build a closed area?
We can. A meeting room with a door that is not visible from the aisle, with its own rails, table and lighting. The outside of the stand shows the brand; the collection opens to the buyer inside.
When should we start?
Starting 8 weeks before the fair for a custom timber build, or 4 weeks for a maxima system, gives a comfortable schedule. Fairs abroad add transit time, so start earlier; if a job comes in late we first tell you what can still be done.

Let us build your stand at your next textile fair

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other industries