Skip to content
Akros Mimarlık
TR

Industry

Energy trade fair stands

General view of the Eonus stand at EV Charge 2025 in Istanbul: a 25 sqm maxima system build.

On an energy stand the product needs electricity: the charger is demonstrated live, the inverter screen stays on, the panel shows its true colour under the light. We draw the stand for that. The power requirement comes out of your equipment list and we request a dedicated circuit from the hall management; cables run inside the walls, and the panel is fixed to a reinforced display wall on its real mounting rail, with the rail and clip left visible.

What we do for you at energy fairs

We draw the stand, produce it in our own workshop in Beylikdüzü, build it in the hall with our own crew and take it down when the fair closes. The power plan is part of the stand: how many kilowatts to which device, whether three-phase is needed, which product wants an uninterrupted circuit, all written into the technical file so we obtain the connection from the hall management ourselves. Graphics and print, lighting and furniture are ours. For a charger we draw a plinth anchored to the floor; your unit arrives on the last build day with the plinth and circuit waiting for it.

The power rating and model are printed in large type right next to the product, and a separate closed corner is kept for technical conversations. For fairs abroad we run the freight, the ATA Carnet and customs; for Germany our Aachen office gives local support on the German side.

Which energy fairs we work at

All three of our jobs in this sector are at CNR Expo Istanbul. In 2025 we built the 110 square metre custom timber stand for Solinved at SolarEX Istanbul and, at EV Charge Show, the maxima stands for Hongfa on 28 square metres and Eonus on 25 square metres. EV Charge Show is next on 26–28 November 2026 and SolarEX on 7–9 April 2027, both at CNR. In Germany, Intersolar Europe runs 8–10 June 2027 at Messe München; for Middle East Energy in Dubai we work with freight and customs included.

Which stand type for an energy stand

  • Custom timber build: 20–500 square metres, 2–5 days to build in the hall. The Solinved stand was this type; in this type the panel wall, cable duct and closed meeting room are produced in one body.
  • Maxima system: 12–200 square metres, 1–3 days. The Hongfa and Eonus stands were this system; in this system the charger plinth is produced separately and fixed to the grid.
  • Island and corner stands: 36–800 square metres, 3–6 days. The charger in the centre, the panel wall facing the aisle.

How we work

Send the fair name and dates, your floor area, the number of open sides and the power ratings of the equipment you will bring; we reply within 48 hours. The first concept is free and three-dimensional; the written budget frame has three options with the scope listed item by item. Starting 8 weeks before the fair gives a comfortable schedule: design approval and technical file at 6 weeks, workshop production at 4 weeks, trial assembly and lighting test in the workshop at 1 week. The quote form opens here.

Upcoming energy trade fairs

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

November 2026

April 2027

June 2027

Our stand types: size and on-site build time

We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site
    Projects
    13 published projects

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site
    Projects
    18 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 3

All projects

Frequently asked

Can we run the charger live on the stand?
Yes. We declare the unit's power rating in the technical file and obtain the three-phase circuit from the hall management. The plinth is drawn anchored to the floor; your technicians make the connection to the unit.
Can you mount panels on their real mounting rail?
We do. The display wall is reinforced to the panel weight and the rail and clip stay visible, so visitors see the mounting detail on the stand.
When does the power reach the stand?
We take the circuit over from the hall management on the first build day and distribute it inside the walls to the device points. Equipment is connected on the last day, and we hand everything over switched on the day before opening.
Who handles the freight to Dubai and Munich?
We do. The stand and the equipment leave Beylikdüzü together; the ATA Carnet and customs paperwork are ours. For distant fairs the shipping time goes into the calendar from the start; the sequence is on the international exhibition stand page.

Let us build your stand at your next energy fair

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other industries