
EonusEnergy
Eonus EV Charge 2025 Istanbul exhibition stand
25 m²2025IstanbulEV Charge Show
Industry

On an energy stand the product needs electricity: the charger is demonstrated live, the inverter screen stays on, the panel shows its true colour under the light. We draw the stand for that. The power requirement comes out of your equipment list and we request a dedicated circuit from the hall management; cables run inside the walls, and the panel is fixed to a reinforced display wall on its real mounting rail, with the rail and clip left visible.
We draw the stand, produce it in our own workshop in Beylikdüzü, build it in the hall with our own crew and take it down when the fair closes. The power plan is part of the stand: how many kilowatts to which device, whether three-phase is needed, which product wants an uninterrupted circuit, all written into the technical file so we obtain the connection from the hall management ourselves. Graphics and print, lighting and furniture are ours. For a charger we draw a plinth anchored to the floor; your unit arrives on the last build day with the plinth and circuit waiting for it.
The power rating and model are printed in large type right next to the product, and a separate closed corner is kept for technical conversations. For fairs abroad we run the freight, the ATA Carnet and customs; for Germany our Aachen office gives local support on the German side.
All three of our jobs in this sector are at CNR Expo Istanbul. In 2025 we built the 110 square metre custom timber stand for Solinved at SolarEX Istanbul and, at EV Charge Show, the maxima stands for Hongfa on 28 square metres and Eonus on 25 square metres. EV Charge Show is next on 26–28 November 2026 and SolarEX on 7–9 April 2027, both at CNR. In Germany, Intersolar Europe runs 8–10 June 2027 at Messe München; for Middle East Energy in Dubai we work with freight and customs included.
Send the fair name and dates, your floor area, the number of open sides and the power ratings of the equipment you will bring; we reply within 48 hours. The first concept is free and three-dimensional; the written budget frame has three options with the scope listed item by item. Starting 8 weeks before the fair gives a comfortable schedule: design approval and technical file at 6 weeks, workshop production at 4 weeks, trial assembly and lighting test in the workshop at 1 week. The quote form opens here.
Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.
Istanbul · CNR Expo Istanbul — Energy · 2 of our stands
Istanbul · CNR Expo Istanbul — Energy · 1 of our stands
Munich · Messe München — Energy
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.
Request a quote