
GmsConstruction
Gms 2025 Münih exhibition stand
153 m²2025Munichbauma
Location

Our clearest example of taking a stand to Munich is bauma 2025: a 153 square metre maxima stand for GMS, produced in Beylikdüzü, trucked to Messe München, built by our own crew and dismantled when the fair closed. At a construction machinery fair the stand has to be solid enough not to be dwarfed by the machine and open enough to show it, and that is how we draw for this kind of fair. The same workflow applies to BAU and Intersolar Europe.
Messe München has 18 halls and 200,000 square metres. The calendar has BAU Munich 11–15 January 2027, Intersolar Europe 8–10 June 2027 and bauma 3–9 April 2028. For building product, solar and construction machinery companies we design the stand, submit a three-dimensional visual for approval, produce and trial-assemble it in the workshop, hand it to freight, build it in the hall and hand it over with a written guarantee.
On a construction machinery stand we place the machine on the open side with room for visitors to walk around it; the meeting area and the kitchen go against the back wall, and the top graphic is hung to read above machine height. Photographs are on the projects page, and the common solutions for stands of this kind are described on our construction and construction machinery pages. Building product manufacturers preparing for BAU will find the relevant approach on the building page.
We arrange the road freight, the export paperwork and the ATA Carnet where needed; each is a separate line in the quote. Messe München's vehicle access hours and build schedule come with the organiser's file, and we follow that file. Our Aachen office provides support on the German side and is on site in fair week. Your machines or samples can travel on the same truck as the stand; the details are on the exhibition logistics page.
Exhibitors from outside Turkey use the same route. The stand is produced in Istanbul, the freight and paperwork are ours, and you have one contact in English from the first drawing to the dismantling.
Akros Mimarlık builds turnkey exhibition stands at Messe München, produced in its own Beylikdüzü workshop and shipped to Munich with customs included. Our 153 square metre maxima stand for GMS at bauma was built here; one contract covers BAU, Intersolar Europe and bauma, freight and ATA Carnet included, with local support from Aachen. First concept free.
Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.
Messe München — Building Materials
Messe München — Energy
Messe München — Construction · 1 of our stands
Brief, floor plan and three-dimensional design visual
Design approval, technical file submitted to the organiser
Production in the workshop; graphics and print files
Trial assembly in the workshop, freight, ATA Carnet and customs
Hall build, handover the day before opening, dismantling at close
Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.
For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.
We have 1 published projects at Munich fairs so far; each card shows how many stands of that type we have built here. All types are produced in our workshop in Beylikdüzü, Istanbul and built by our own crew.
Aluminium profile frame with clad panels; fast to install.
Purpose-built timber stand produced from scratch for each show.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.
Request a quote