Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builders in Konya

The product that arrives at a stand in Konya is usually heavy: an agricultural machine, milling equipment, an automotive part. We draw the stand around that, with the floor load, the machine's entry sequence into the hall and the power supply planned in the first step of the design. The stand is produced in our Beylikdüzü workshop, assembled once with a lighting test before it ships, brought to Konya by truck and built by our own crew. When the fair closes we dismantle it as well.

What we do at Konya fairs

The fair name, dates, floor area and number of open sides come in; within 48 hours we send the first concept as a three-dimensional visual, free of charge. After approval we submit the technical file to the organiser and handle graphics and print. For companies showing machinery we start the plan from the machine: room for visitors to walk around it, the meeting table and the kitchen against the back wall, the top graphic hung to read above machine height.

The 182 square metre maxima stand we built for Emintosun at LIGNA 2025 in Hanover and the 153 square metre maxima stand for GMS at bauma 2025 in Munich are examples of how a system stand works on a large plot; both are on the projects page. The industry pages are agriculture, machinery and industry, food and beverage and automotive. Companies from Konya exhibiting in Istanbul will find our Tüyap and CNR Expo work on the Istanbul page.

Exhibitors from outside Turkey get the same service in Konya: one contract, one contact in English, our crew in the hall for the build and the dismantling.

Freight and build schedule

A comfortable programme starts 8 weeks before the fair: design approval and technical file at 6 weeks, workshop production and print files at 4 weeks, trial assembly and shipping at 1 week. For Konya the freight day is added to the schedule, and the build crew is in the hall on the same day as the truck. Your machine can travel on the same truck as the stand or arrive separately; the details are on the exhibition logistics page. The hall's vehicle access and build hours come with the organiser's file; we follow the file and time the machine's entry accordingly.

Which stand type for Konya

  • Custom timber build: 20–500 square metres, 2–5 days to build in the hall. For a heavy machine plinth and an uninterrupted surface.
  • Maxima system: 12–200 square metres, 1–3 days to build. When the machine itself is the main visual, a light frame is enough; the Emintosun and GMS stands are this type.
  • Island and corner stands: from 36 square metres, 3–6 days to build; for open plots where the machine is shown from all four sides.

Working timeline for a fair in Konya

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly and lighting test in the workshop, dispatch

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Dispatch from the workshop to the hall
What goes into exhibition stand pricing

Our stand types for Konya fairs

We produce all of the types below for Konya fairs in our workshop in Beylikdüzü, Istanbul and build them with our own crew; the size range and build time come from our recorded projects.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

When should a stand for Konya be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
Can you put an agricultural machine inside the stand?
Yes. Give us the machine's weight and dimensions, and its power needs if it is to be shown running, in the quote request; we plan the floor load and the entry sequence and obtain the approval from the hall management.
Who builds the stand?
Our own crew comes from Istanbul, builds the stand, walks it with you the day before opening and dismantles it at the close. Handover comes with a written guarantee.
When should we start for Konya?
8 weeks before the fair, with the freight day inside the programme. If a job comes in later we first tell you what can still be done, then run an accelerated programme.
What should we send for a quote?
The fair name and dates, the floor area in square metres and the number of open sides, and the dimensions and weight of the machine you will show. Put it into the quote form; the first concept is free, the budget frame comes in three options and the scope is written item by item.

Let us build your stand at your fair in Konya

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries