Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builders in Dubai

Companies exhibiting in Dubai usually want to bring their stand from Istanbul because they want the workshop they know, the design they signed off and the crew they have met at build-up. That is what we do: the stand is produced in our workshop in Beylikdüzü, shipped to Dubai by sea or air and built at Dubai World Trade Centre by our own crew. Customs and the correspondence with the organiser are ours as well.

What we do at Dubai fairs

Dubai World Trade Centre, with 17 halls and 105,000 square metres, is our main venue in the Gulf, and the three fairs we follow are all held there. Gulfood Manufacturing runs on 3–5 November 2026; for a company bringing food processing machinery we put the floor load, the power supply and the water connection into the plan first, and the food and beverage page describes what we do on those stands. Big 5 Global runs on 23–26 November 2026; for building material producers we draw the heavy sample wall on a reinforced structure, with details on the building page. For Middle East Energy see the stands we have built in the energy sector; the dates are on the fair page.

We do not yet have a published project page from Dubai. For our work abroad, the 54 square metre timber stand for Er Bakır at Interwire 2025 in Atlanta and the 100 square metre stand for İba Kimya at PaintExpo 2024 in Karlsruhe are on the projects page.

Freight, customs and local support

A stand does not travel to Dubai by road; we choose sea or air freight according to the schedule and the volume of the stand. Sea freight needs an earlier departure, so for Dubai we bring production forward compared with a European fair and write the shipping date into the schedule from the start. We issue the ATA Carnet for temporary import, follow the exit from Turkey and the entry into Dubai, and bring the dismantled stand back on the same document after the fair. The organiser's technical file, the electricity order and the height approval are written by us. We know how timber and surface finishes behave in a hot climate and choose materials accordingly. The whole process is on the exhibition logistics page.

Which stand type for Dubai

  • Custom timber build: uninterrupted surfaces, dimensions drawn for your brand, reinforced walls for heavy samples; 2–5 days of build-up in the hall.
  • Maxima system: aluminium grid with printed panels; light enough to make air freight worthwhile, built in 1–3 days.
  • Island and corner stands: on plots with several open sides we turn the product towards the aisle.

Send the fair name and dates, your floor area and the number of open sides through the quote form; within 48 hours you receive a free first concept and a written budget in three options.

Fair venues in Dubai

  • Dubai World Trade Centre
    Halls
    17 halls
    Area
    105,000 m²
    Fairs in calendar
    3 fairs in calendar

    Akros Mimarlık builds turnkey exhibition stands at Dubai World Trade Centre, produced in its Istanbul workshop and shipped to Dubai with customs included. One contract covers Big 5 Global, Gulfood Manufacturing and Middle East Energy across the venue's 17 halls, freight and ATA Carnet included. The first concept is free, with a written budget in three options.

Upcoming fairs in Dubai

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

November 2026

Working timeline for a fair in Dubai

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types for Dubai fairs

We produce all of the types below for Dubai fairs in our workshop in Beylikdüzü, Istanbul and build them with our own crew; the size range and build time come from our recorded projects.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site

    Purpose-built timber stand produced from scratch for each show.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site

    Aluminium profile frame with clad panels; fast to install.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Stands we have built

We have not published a project under this heading yet; these three stands from other fairs show the work of our workshop.

All projects

Frequently asked

Do you build at the fair venues in Dubai?
Yes: Dubai World Trade Centre. Hall rules vary by fair; we submit the technical file to the organiser.
When should a stand for Dubai be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
Can we get a quote for the upcoming fairs in Dubai?
Yes. The link next to each fair in the calendar opens a quote form with the fair name and dates already filled in; add the floor area and stand type and send it.
Does the stand go to Dubai by sea or by air?
Either. We choose according to the schedule and the volume of the stand: sea freight leaves earlier, air freight leaves later and carries less volume. Both options are written into the quote and the decision is taken together.
Who handles customs and the ATA Carnet in Dubai?
We do. The parts list goes on the carnet, we follow the exit from Turkey and the entry into Dubai, and if your products travel with the stand we add their list to the carnet. There is nothing for you to prepare.
Who builds the stand in Dubai?
The crew that produces it in Beylikdüzü travels to Dubai. Build-up and dismantling hours come from the organiser's and Dubai World Trade Centre's documents; we walk the stand with you the day before opening and hand it over in writing.
When should we start?
Earlier than for a European fair. Because shipping takes longer, the design should start at least 8 weeks before the fair and production is brought forward to match. If you come to us later we first tell you what can still be done with air freight.

Let us build your stand at your fair in Dubai

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries