
İBA KimyaChemicals
İba Kimya PaintExpo 2024 Karlsruhe exhibition stand
100 m²2024KarlsruhePaintExpo
Industry

At a chemicals fair the product stays in the drum; what the buyer sees is the result. A painted panel, a coated surface, two samples side by side showing what the additive does. We build the stand for that comparison: a wall that holds sample panels at a height you can look at closely, lighting under which a colour card reads true, surfaces as clean as a laboratory, and a closed room where a technical conversation stays inside. We built the 100 square metre timber stand for İba Kimya at PaintExpo 2024 in Karlsruhe; a custom timber build delivers this layout from a single hand.
We draw the stand, produce it in our own workshop in Beylikdüzü, build it in the hall with our own crew and dismantle it when the fair closes. Graphics, print and the technical file for the hall management are ours; for fairs abroad so are the stand freight, the ATA Carnet and customs. Your sample panels and any chemicals on display travel on your own export and safety papers, and the organiser’s rules on what may be shown are tracked in our technical file.
On a paint and coatings stand colour accuracy comes before everything else. The sample wall is lit to match the light your colour cards were prepared under. Panels sit on hangers that can be swapped, so a new sample that arrives during the fair goes straight onto the wall. For raw material and additive producers the product is invisible, so the stand itself does the talking: an uninterrupted surface, good light and a large, plain brand wall.
In Istanbul at CNR Expo, TURKCHEM Eurasia runs on 25–27 November 2026 and Turkcoat / paintistanbul for paint and coatings on 24–26 November 2027. In Germany, PaintExpo at Messe Karlsruhe is on 25–28 April 2028; in 2024 we built the 100 square metre timber stand for İba Kimya there. The European Coatings Show at Messezentrum Nürnberg is on 27–29 April 2027. Our Aachen office gives local support at German fairs.
Fair name, dates, floor area and number of open sides; within 48 hours you get a free first concept in three dimensions and a written budget in three options, scope itemised. Start 8 weeks before the fair: design approval and technical file at 6 weeks, workshop production at 4, trial assembly and lighting test at 1. Put the size and number of your sample panels in the brief; the wall is divided to them. The quote form is here.
Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.
Istanbul · CNR Expo Istanbul — Chemicals
Nuremberg · Messezentrum Nürnberg — Chemicals
Istanbul · CNR Expo Istanbul — Chemicals
Karlsruhe · Messe Karlsruhe — Chemicals · 1 of our stands
We produce all of them in our own workshop. The size range and on-site build time come from our recorded projects; if you are undecided we draw two types for the same floor area and show them side by side.
Purpose-built timber stand produced from scratch for each show.
Aluminium profile frame with clad panels; fast to install.
Component system built from aluminium profiles and panels; quick build and a small shipping volume.
Meeting space on the upper level; two floors on the same footprint.
Open on all four sides; approachable from every direction.
Shared area for many exhibitors with individual booths and one welcome desk.
Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.
Request a quote