Skip to content
Akros Mimarlık
TR

Location

Exhibition stand builders in Nuremberg

General view of the Ağaoğlu Silah stand at the fair 2025 in Nurumberg: a 60 sqm maxima system build.

Most companies that come to us for Nuremberg have already booked their space and want to know two things: how the stand gets there and who builds it in the hall. Both are ours. We draw the stand in Istanbul, build it in our workshop in Beylikdüzü, truck it to Germany and put it up at Messezentrum Nürnberg with the same crew that made it. You arrive on the morning of the opening with your products.

What we do at Nuremberg fairs

Our most recent stand in the city is the Ağaoğlu Silah stand at IWA OutdoorClassics 2025, 60 square metres on the maxima system at Messezentrum Nürnberg. For an exhibitor showing firearms and hunting equipment the lockable display cases, the product hangers and the light falling on each item decide the design; on this kind of stand we let the aluminium grid behind the panels carry the product load rather than the panel face. Our other work for firearms manufacturers is collected on that industry page.

We follow three fairs in Nuremberg, all held at Messezentrum Nürnberg: IWA OutdoorClassics on 4–7 March 2027, the European Coatings Show on 27–29 April 2027 and FACHPACK on 21–23 September 2027. Paint and coatings producers will find what we do for their stands on the chemicals page, packaging material and machinery producers on the packaging page.

Freight, customs and local support

Before the stand leaves the workshop we assemble it once, switch on the lights, then label every part and load the truck. Temporary export from Turkey to Germany runs on an ATA Carnet: we issue it, we follow it through customs on both sides, and the stand returns to Turkey on the same document after the fair. Our Aachen office provides support on the German side during build-up week. The technical file, the electricity order and the rigging permit are settled weeks before build-up; the truck leaves one week before the fair.

Which stand type for Nuremberg

  • Custom timber build: uninterrupted surfaces, dimensions drawn for your brand, reinforced structure for heavy products; 2–5 days of build-up in the hall.
  • Maxima system: printed panels on an aluminium grid, built in 1–3 days. The Ağaoğlu Silah stand was maxima, and it is our first suggestion when build-up days are short.
  • Island and corner stands: on plots with two or three open sides we turn the product wall towards the aisle.

If you are undecided we draw both for the same floor area and show them side by side. Send the fair name, your floor area and the number of open sides through the quote form; we reply within 48 hours and the first concept is free.

Fair venues in Nuremberg

  • Messezentrum Nürnberg
    Fairs in calendar
    3 fairs in calendar

    Akros Mimarlık builds turnkey exhibition stands at Messezentrum Nürnberg for exhibitors from Turkey, with freight and customs handled by us. The 60 square metre maxima stand for Ağaoğlu Silah at IWA OutdoorClassics is our work here, produced in Beylikdüzü, shipped under ATA Carnet and built by our own crew with Aachen office support. First concept free.

Upcoming fairs in Nuremberg

Full fair calendar

Dates come from the organisers’ official sites; past fairs drop off the list. The link on each row opens a quote form with the fair name and dates filled in.

March 2027

April 2027

September 2027

Working timeline for a fair in Nuremberg

  1. 8 weeks before

    Brief, floor plan and three-dimensional design visual

  2. 6 weeks before

    Design approval, technical file submitted to the organiser

  3. 4 weeks before

    Production in the workshop; graphics and print files

  4. 1 week before

    Trial assembly in the workshop, freight, ATA Carnet and customs

  5. Fair week

    Hall build, handover the day before opening, dismantling at close

What determines the price

Our quote lists the scope item by item; we take a brief before quoting, because two stands of the same size can differ a lot.

  • Floor area and the number of open sides
  • Stand type: custom timber or maxima system
  • Height, suspended ceiling and rigging needs
  • Fittings such as lighting, screens and furniture
  • Venue rules and build hours
  • Freight distance and customs
What goes into exhibition stand pricing

Logistics note

For installations abroad, freight, ATA Carnet and customs are handled by Akros; the stand is produced in the Istanbul workshop and shipped to the hall.

Our stand types for Nuremberg fairs

We have 1 published projects at Nuremberg fairs so far; each card shows how many stands of that type we have built here. All types are produced in our workshop in Beylikdüzü, Istanbul and built by our own crew.

  • Maxima System
    Size
    12–200 m²
    Build
    1–3 days on site
    Projects
    1 published projects

    Aluminium profile frame with clad panels; fast to install.

  • Custom Timber Build
    Size
    20–500 m²
    Build
    2–5 days on site

    Purpose-built timber stand produced from scratch for each show.

  • Modular
    Size
    9–150 m²
    Build
    1–2 days on site

    Component system built from aluminium profiles and panels; quick build and a small shipping volume.

  • Double Decker
    Size
    60–600 m²
    Build
    4–8 days on site

    Meeting space on the upper level; two floors on the same footprint.

  • Island and Corner
    Size
    36–800 m²
    Build
    3–6 days on site

    Open on all four sides; approachable from every direction.

  • Country Pavilion
    Size
    100–2000 m²
    Build
    4–10 days on site

    Shared area for many exhibitors with individual booths and one welcome desk.

Projects 1

All projects

Frequently asked

Do you build at the fair venues in Nuremberg?
Yes: Messezentrum Nürnberg. Hall rules vary by fair; we submit the technical file to the organiser.
When should a stand for Nuremberg be ordered?
At least eight weeks before the fair for a custom timber stand, four weeks for a maxima system stand; for builds abroad we add a week for freight and customs.
What determines the price?
Floor area, stand type, number of open sides, height, fittings and venue rules. The quote lists the scope item by item; we take a brief before quoting.
Can we get a quote for the upcoming fairs in Nuremberg?
Yes. The link next to each fair in the calendar opens a quote form with the fair name and dates already filled in; add the floor area and stand type and send it.
When does the stand leave for Nuremberg?
Road freight leaves the workshop one week before the fair; that margin covers customs and the delivery slots at the hall. The departure date is written into the schedule at the start and production is planned backwards from it. If you want your products on the same truck we add them to the carnet.
Who deals with customs and the ATA Carnet?
We do. The parts list of the stand goes on the carnet, we follow the procedure at the Turkish exit and the German entry, and after dismantling the stand travels back on the same carnet. There is nothing for you to prepare.
Is the build-up done by your own crew?
Yes, the crew that builds the stand in Beylikdüzü travels to Nuremberg. Build-up and dismantling hours come from the documents of Messezentrum Nürnberg and the organiser; we walk the stand with you the day before opening and hand it over in writing.
Is language a problem in Germany?
No. We handle the correspondence with the hall management and the organiser, and our Aachen office provides support on the German side. You keep talking to us in Turkish or English, whichever you prefer.

Let us build your stand at your fair in Nuremberg

Send the fair name, dates and your floor area; the first concept and a written budget frame arrive within a few working days. The concept is free of charge.

Request a quote

Other cities and countries