Skip to content
Akros Mimarlık
TR

Exhibition stand guide

Building a stand at CNR Expo Istanbul: rules, hours and handover

Ömer Faruk Süer · Senior Sales Manager · 3 min read · Last updated:

Design visualisation of the Yeniler Etiket stand at the Eurasia Packaging Fair: a green brand fascia on a dark body, timber display units and label rolls.

Short answer

How does a stand build work at CNR Expo?

CNR Expo Istanbul is in Yeşilköy, next to the airport, with 11 halls and 98,000 square metres of indoor space. The build takes place in the two- or three-day window set by the organiser, through the loading ramps behind the halls; vehicle entry is regulated by registration and time slot. The height limit is 4 to 6 metres depending on the hall, and rigging is applied for weeks before the fair. The power line is brought to the stand by CNR’s contracted supplier. From our workshop in Beylikdüzü we reach CNR in an hour and finish the build with our own crew in two days.

The reasoning follows below, section by section

Sources

Is your question bigger than this article? Send the fair name and floor size; we reply within two working days.

Get a quote